Indian Navy › Procurement

NGMV — Next Generation Missile Vessels

ACTIVE

Six high-speed missile vessels under construction at Cochin Shipyard for the Indian Navy

Budget

₹9,805 Cr

Timeline

2023–2027+

Sector

Indian Navy

Indigenisation

85%

PROCUREMENT TIMELINE

AON

AON

Acceptance of Necessity — CCS/DAC approves the requirement.

RFI

RFI

Request for Information — industry capability survey.

RFP

RFP

Request for Proposal — detailed tender issued to vendors.

ToC

ToC

Transfer of Technology clause negotiations.

CNC

CNC

Contract Negotiation Committee finalises terms.

Contract

Contract

Contract signed with selected vendor(s).

Dev/Trial

Dev/Trial

CURRENT

Development, integration and user trials.

Induction

Induction

INTEL SIGNALS

Near induction — watch for contract award

PIB confirms the MoD signed the six-ship NGMV contract with Cochin Shipyard Limited in Mar 2023 at ₹9,805 crore. Steel cutting for the first ship was held on 16 Dec 2024, and induction is planned from 2027 onwards. Earlier GRSE/HSL attribution was incorrect.

RECENT INTELLIGENCE

KEEL LAYING OF FIRST NEXT GENERATION MISSILE VESSEL (NGMV) FOR INDIAN NAVY AT COCHIN SHIPYARD LIMITED, KOCHI - Press Information Bureau

news.google.com · 19 Sept 2026

India Eyes to Export 1,450-Ton Next Gen Missile Vessels (NGMV) Featuring BrahMos and Advanced Stealth Tech to Friendly Nations - Defence.in

news.google.com · 30 Mar 2026

STEEL CUTTING OF SECOND NEXT GENERATION MISSILE VESSEL (NGMV) FOR INDIAN NAVY AT COCHIN SHIPYARD LIMITED, KOCHI - Press Information Bureau

news.google.com · 18 Sept 2026

India’s Next Generation Missile Vessels (NGMVs): What Do They Mean For Pakistan? - OpEd - Eurasia Review

news.google.com · 30 Dec 2025

STEEL CUTTING OF SECOND NEXT GENERATION MISSILE VESSEL (NGMV) FOR INDIAN NAVY AT COCHIN SHIPYARD LIMITED, KOCHI - Revoi.in

news.google.com · 18 Sept 2026

PROGRAM BRIEF & FREQUENTLY ASKED QUESTIONS

Essential facts about NGMV

Pipeline Status

Stage 6/7

Under Construction

Estimated Budget

₹9,805 Cr

Financial Outlay

Target Timeline

2023–2027+

Operational Target

Armed Service

Indian Navy

85% Indigenous

What is the current status and stage of NGMV?▾

NGMV — Next Generation Missile Vessels is currently at Stage 6 of 7 in the Indian defence procurement procedure (Under Construction). Six high-speed missile vessels under construction at Cochin Shipyard for the Indian Navy

What is the estimated budget or outlay for NGMV?▾

The allocated budget outlay for NGMV is estimated at ₹9,805 Cr.

When is NGMV expected to be inducted or deployed?▾

The program schedule indicates 2023–2027+.

Which agencies and companies are building NGMV?▾

NGMV is developed in coordination with vendors: Cochin Shipyard Limited.

What is the indigenisation level of NGMV?▾

NGMV targets an indigenous content of 85%, advancing domestic defence manufacturing under Atmanirbhar Bharat.